On March 19, 2018, the Mill Valley City Council adopted a Resolution accepting as complete the Miller Avenue Streetscape Project. This project webpage serves as an archive for the project. Thank you to everyone who contributed to the project.
STAY CONNECTED:
Sign up for Weekly Miller Ave updates
Sign up for MVConnect
Follow Miller Ave on Twitter
Like us on Facebook
Recent Activities & News
The Miller Avenue “Streetscape” refers to roadway and sidewalk elements located in the public right of way, including sidewalks, bike lanes, travel lanes, curb areas, medians and landscaping. The overall goal of the project is to make Miller Avenue a safe, efficient, and enjoyable street for all users: pedestrians, bicyclists, motorists, transit users, business people, shoppers and visitors. Likewise, the Miller Avenue roadway design must balance the needs and functions of the street--as a transportation thoroughfare, a healthy commercial district, respectful neighbor & social gathering place.
The Miller Avenue Streetscape Project extends from Sunnyside to Almonte-- approximately 1.8 miles. There are five "rooms" within this project area that characterize the look and feel of the area along the street. Main components of the Streetscape Project include establishing a continuous bike lane from Sunnyside to Almonte, sidewalk repair and widening in some sections, improvements to bus shelters, and improvements to the drainage and pavement of the actual roadway. Click here for a larger image of the rooms below.
Planned Work | |
---|---|
Passage: Sunnyside-Millwood Pavement Re-Surfacing Sidewalk/Ramp Repair New Inbound Sidewalk Sewer Repair Restriping (including buffered BikeLanes-completed) |
Parkway: Millwood-Willow Pavement Re-surfacing Sewer Repair Restriping (including bike lanes) Locust-Willow: 2 hour parking |
Mainstreet: Willow-Reed/Valley Circle Street Realignment (road, bike, parking, transit, sidewalk) New Paving Restriping (including buffered bike lanes) Evergreen Flashing Pedestrian Crossing Drainage Sewer Repair Landscaping and Rain Gardens Lighting Modified Parking Regulations |
Gateway: Reed/Valley Circle-Camino Alto Pavement Re-Surfacing Restriping (including buffered bike lane) Sidewalk/Ramp Repair Reed/Valley Circle Flashing Pedestrian Crossing Sewer Repair Modified Parking Regulations |
Marsh: Camino Alto-Almonte Pavement Re-Surfacing Sidewalk/Ramp Repair Restriping (including buffered bike lane) Connection to Multi-Use Pathway Drainage Improvements |
The original streetscape plan is available under "Project Documents." Since its adoption, the project has undergone further refinements to address detailed engineering, project costs and funding. Detailed construction-related drawings are available under "Construction & Schedule Updates" See section drawings below for basic depiction of the proposed work by "room."
ROOM NAME | STREET BOUNDARY | ILLUSTRATIONS OF PROPOSED WORK |
---|---|---|
Passage | Sunnyside to Millwood | For a section drawing, click here. |
Parkway | Millwood to Willow | |
Main Street | Willow to Reed | For a section drawing, click here. |
Gateway | Reed to Camino Alto/Almonte | For a section drawing, click here. |
Marsh | Camino Alto-Almonte | For a section drawing, click here. |